(1) Ground preparation
Ground preparation refers to the removal of various obstacles within the mining area and the establishment of ground facilities, such as land acquisition and demolition, felling trees, river reconstruction, lake dewatering, seven-pass and one-level (through water, water, electricity, communication, ventilation) , heat, access, level the ground) and so on.
(2) Dewatering and drainage of deposits
In the mining of large deposits of groundwater, in order to ensure the normal production of open pit mines, it is necessary to pre-exclude groundwater within a certain mining range, that is, to carry out dewatering work, and to take measures such as interception to isolate the inflow of surface water. The dewatering and drainage of the deposit is not completed once, but runs through the entire production cycle of the open pit.
(3) Mine infrastructure
The mine infrastructure work is the necessary construction work to ensure production before the open pit mine is put into production, including digging in and out of the ditch and opening trenches, stripping rocks, laying transport routes, constructing dumping sites, purchasing necessary production and living facilities, and building industrial plants and Welfare facilities such as water and electricity. The access channel is a sloping transportation path for the connection between the surface and the working level and the working level, and the excavation is carried out on the side of the step; the opening groove is to open the mining work line at each level. Horizontal channel.
(4) Mine production
Mine production is the process of investing manpower, material resources and financial resources in ore mining, including the most important projects in trench mining, stripping and mining. The main processes are basically the same, generally including perforation, blasting, and loading. , transportation, dumping and other processes.
(5) Surface restoration
As society pays more and more attention to environmental issues and the shortage of land resources, the land occupied by open-pit mining or the ecological environment damage will be destroyed. At the end of production or during production, there will be planned restoration or ecological reconstruction. The social obligations of mining companies. Surface restoration pathways include: reforestation, aquaculture, Tiantang interphase, pasture grassland structure, afforestation, soil and water conservation vegetation, water tourism, construction land, reservoir construction, and comprehensive development.
A substance used in small quantities to increase the rate of reaction when used with a Catalyst. Commonly used accelerators are DMP-30, triethanolamine, BDMA, CT-152x, DBU, EP-184 and so on. Our promoter variety complete, stable performance, after sale worrieless, welcome to order
Jiangyin Qian Chemical Co., Ltd. is a professional one-stop composite problem solver, production and processing of Unsaturated Polyester Resin, vinyl Resin , Epoxy Resin, gelcoat resin, glass fiber, curing agent, accelerator, color paste, stripping wax and other composite products, products have been sold all over the country and exported to dozens of overseas countries and regions.
Accelerant,Accelerator,The Accelerator,Hyper Accelerator
Jiangyin Thousands Chemicals Co. , https://www.jywqhxcomposite.com