Pear black spot is a worldwide disease that occurs extensively in pear growing areas and is one of the three major diseases of pears. The disease is caused by Alternaria pyogenes. The pathogenic bacteria mainly infects the leaves, shoots, and fruits of fragrant pears. When the fruit matures, it forms a nearly round or irregular black-brown lesion on the surface of the fruit, which is depressed in the middle, and produces black moldy layer on the surface of the lesion when wet, which seriously affects the yield and quality of the fruit. It is a typical latent infestation disease that can be invaded through various pathways during the flowering period and fruit development period, and is latent to the onset of storage. Korla fragrant pear is a traditional pear variety with distinctive characteristics in Xinjiang, which brings greater economic benefits to the local forestry industry. The vehicle-borne spore trap is very effective for the capture of pathogen spores, and its research has a very important role in sampling.
Pear black spot pathogens use conidia and mycelium to overwinter on diseased shoots, diseased shoots, and diseased fruit, and new conidia are produced from the diseased tissue the following spring, spreading by wind and rain. When the spores germinate, they invade through the pores and stomata of the pear bark or directly penetrate the host epidermis, causing initial infection. Then in the pear growth period, new spores can be generated multiple times to infect and form repeated infections. At present, there are no studies on conidial transmission and its incidence rules and dynamic monitoring of the disease in orchard air at home and abroad.
Vaseline-coated slides were placed in vehicle-borne spore traps in two fragrant pear orchards, and samples were taken twice a week. Slides were serially numbered and recorded, brought back to the laboratory, and counted under a biological microscope. And records. From the inflorescence extending period to the flowering stage, 8 trees were selected as the observation point around the spore trap in the test orchard. Pear blossoms were collected twice a week. Each time, 25 pear flowers were randomly collected and numbered. 15 flowers were selected for isolation and culture. They were surface-sterilized with 0.25% sodium hypochlorite for 45 seconds under aseptic conditions, washed three times with sterile water, placed on sterile PCA medium plates, incubated at 25° C. for 5-7 days, and purified to grow. Colonies, microscopic observation and identification. The DNA of the other 10 flowers was extracted with a DNA extraction kit and eluted twice with 50 μL of sterile water. The nucleic acid protein analyzer was used to determine the purity and concentration of the sample DNA, and PCR was performed to identify the sample.
The spores of P. fragariae were captured by the vehicle-borne spore catcher at different time in the export orchard and the pathogens in flowers and fruits were detected and monitored, and the growth and decay of the spores in the orchard were ascertained. The relationship between disease occurrence and severity and spores and meteorological factors in the orchard was clarified, which provided the basis for controlling orchard black pear disease in orchards.
Add Wechat to give you more professional information:
CO2 Welding Wire Production machine
WELDING WIRE DRAWING AND CUTTER MACHINE LINE
1-ROD WIRE PRETREATMENT(PAY OFF+DESCALER MACHINE+SAND BELT MACHINE)
2-ROUGH WIRE DRAWING MCHINE LZ560
3-HIGH SPEED STRAIGHTENER AND CUTTER MACHINE
4-THE FINISHED WIRE Φ2.50X350 Φ3.25X350 Φ4.0X450mm.
WE CAN MAKE THE WELDING WIRE ACCORDING TO THE BUYERS REQUIREMENTS
5.THE FIRST YEAR SERVICE INCLUDE THE SPAREPART IS FREELY SERVICE(BUT NOT INCLUDE THE BUYERS DELIBERATELY BREAKS THE MACHINE OR PARTS),THE SECOND AND THIRD YEAR JUST PAY THE PARTS COST.THE SELLER MUST OFFER THE LIFE-SERVICE FOR THE MACHINE LINE.
6.THE SELLER MUST GUARANTEE TO PRODUCE THE GOOD QUALITY FINISHED WELDING WIRE.
THE SELLER MUST OFFER THE ELECTRICITY MAP,TOUCH SCREEN,AND MANUAL BOOKS,MAINTAIN BOOKS,AND OTHER TECHNICAL DETAILS WITH ENGLISH.TRAIN THE BUYERS WORKERS TO MASTER THE MACHINE
7.SEA WORTHY PACKING, BIG MACHINES WRAPPED WITH PLASTIC NYLON, SMALL MACHINES AND PRECISION MACHINE MUST PACKED IN PLYWOOD BOXES THEN FIXED IN THE CONTAINER
LZ600 wire drawing machine
1. 1 Professional and technical personnel are required to carry out installation and commissioning. Before use, it is necessary to carefully read this manual and the relevant electrical instructions provided.
1. 2 Each machine and electric control cabinet shall be reliably grounded with a grounding resistance not more than 4Ω.
1. 3 There should be no accumulated water on the table top, especially near the operation box, as it can easily lead to circuit failure due to water infiltration.
1.4 It is prohibited for multiple people to operate the same equipment at the same time to avoid accidents.
1. 5 The electric control cabinet should be placed in a clean and dry room, and the door should be closed when working to prevent dust intrusion from causing device performance degradation or failure. Air conditioning is used to maintain the ambient temperature of the electric control cabinet. Frequently check the operation of the cooling fan on the top of the electric control cabinet.
1. 6 Before starting the machine, check whether the safety device is normal.
1. 7 Do not operate the components in the electrical cabinet with power. After cutting off the main power supply, wait at least five minutes, and wait until the intermediate circuit capacitance is discharged before operating the frequency converter, motor, or motor cable.
1.8 Do not touch the IC circuits on the inverter control interface board and motor control board, as static electricity may damage these circuits.
1.9 Please provide the power supply and operating environment according to the technical requirements of Section 3.2. It is not allowed to arbitrarily change the parameters of the frequency converter and PLC. The user shall be responsible for any damage to electrical components caused by human factors.
The second Delivery inspection
2. 1. Check whether the equipment is damaged and complete upon delivery (according to the packing list). If there is any damage or inconsistency with the contract, please contact the dealer or manufacturer immediately.
2. 2 The manufacturer is only responsible for quality issues arising during production, and is not responsible for damage caused during unpacking, improper installation and use, or damage caused by overload operation.
2. 3 After unpacking, the accompanying documents should be properly kept, as they are necessary during equipment installation, commissioning, and use.
CO2 welding Wire Production Line,Welding Wire Production Equipment Line,Production Line For Wire Barrel Packaging,Welding Wire Copper Plating Machinery=Proper(B10)
Jiangyin Wanyi Machinery CO.,Ltd , https://www.wydrawmachine.com