Project Name: Tangshan told EMU R&D and test platform construction project R&D building construction project (December 2011-December 2012, 0.01 million)
Region: Hebei Progress: Engineering Design and Construction Period: December 2011-December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities.
Project Profile: The project is located at No. 3, Qianqian Road, Fengrun District, Tangshan, Hebei Province, China. Two 13-storey R&D buildings are built. Each building has a two-storey basement with a total floor area of ​​approximately 50,000 square meters.
The project has a total investment of 0.01 billion yuan.
Region: Hebei Progress: Engineering Design and Construction Period: December 2011-December 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities.
Project Profile: The project is located at No. 3, Qianqian Road, Fengrun District, Tangshan, Hebei Province, China. Two 13-storey R&D buildings are built. Each building has a two-storey basement with a total floor area of ​​approximately 50,000 square meters.
The project has a total investment of 0.01 billion yuan.
Construction Unit: Tangshan Railway Passenger Vehicle Co., Ltd. Postal address: No. 3, Qianqian Road, Fengrun District, Tangshan, Hebei Postcode: 063035
Contact: Li Minggao Telephone, 15931487015
Related Developments: Tower Crane Infrastructure Project
DHW, Hot Water, All in One
FOSHAN UWOTEC NEW ENERGY CO., LTD. , https://www.uwo-heatpump.com